Milwaukee Public Schools will receive sealed quotations for furnishing all labor, tools, equipment and materials necessary, including public liability and property damage insurance to perform all work necessary and incidental to the Substation Maintenance at Riverside University High School, 1615 East Locust Street, Milwaukee, WI 53211 until 1:30 P.M. on Tuesday, July 9, 2013 at the Division of Facilities and Maintenance Services; 1124 North 11th Street; Milwaukee, Wisconsin 53233; to the attention of: John Linn, Manager of Design and Construction. The HUB, COIN and Student Participation requirements for this project are 0%. Plans and specifications may be obtained 7:30 A.M. to 5:00 P.M. Monday through Friday from A/E Graphics, Inc.; 4075 North 124th Street, Brookfield, WI 53005; phone (262) 781-7744; fax (262) 781-4250. Call A/E Graphics, Inc. for availability of bid documents. Plans and specifications may also be viewed online at A/E Graphics, Inc. @ www.aegraphics.com. A Pre-bid Walk Through is scheduled at the site on Thursday, June 27, 2013 at 9:00 AM. Meet at the front entrance. The right is reserved to reject any or all bids or to waive informalities. 10336414/6-18-25-7-2
GREGORY THORNTON, ED.D.
Superintendent of Schools.