NOTICE
Milwaukee Public Schools will receive sealed quotations for furnishing all labor, tools, equipment and materials necessary, including public liability and property damage insurance to perform all work necessary and incidental to the Parking Lot Access Control System at:
Division 1 – Rufus King School for the College Bound, 1801 W. Olive Street, Milwaukee, WI 53209
Division 2 – Gwen T. Jackson Early Childhood Center, 2121 W. Hadley Street, Milwaukee, WI 53206
until 1:30 P.M. on Tuesday, July 29, 2014 at the Division of Facilities and Maintenance Services; 1124 North 11th Street; Milwaukee, Wisconsin 53233; to the attention of: John Linn, Manager of Design and Construction. The HUB, COIN and Student Participation requirements for this project are 0%. Plans and specifications may be obtained 7:30 A.M. to 5:00 P.M. Monday through Friday from A/E Graphics, Inc.; 4075 North 124th Street, Brookfield, WI 53005; phone (262) 781-7744; fax (262) 781-4250. Call A/E Graphics, Inc. for availability of bid documents. Plans and specifications may also be viewed online at A/E Graphics, Inc. @ www.aegraphics.com.
A Pre-bid Walk Through is scheduled at the sites on Thursday, July 17, 2014 at the following times:
Division 1 – Rufus King School for the College Bound: 9:00 AM
Division 2 – Gwen T. Jackson Early Childhood Center: 10:30 AM
Meet at each site’s parking lot entrance.
The right is reserved to reject any or all bids or to waive informalities.
DARIENNE B. DRIVER, Ed.D, Acting Superintendent.
10574141/7-8-15-22