NOTICE
Milwaukee Public Schools will receive sealed quotations for furnishing all labor, tools, equipment and materials necessary, including public liability and property damage insurance to perform all work necessary and incidental to the 2013 Boiler Tube Replacement at MacDowell Montessori School, 6415 W. Mount Vernon Avenue; Milwaukee, WI 53213 until 1:30 P.M. on Thursday, May 9, 2013 at the Division of Facilities and Maintenance Services; 1124 North 11th Street; Milwaukee, Wisconsin 53233; to the attention of: John Linn, Manager of Design and Construction. The HUB, COIN and Student Participation requirements for this project are 0%. Plans and specifications may be obtained 7:30 A.M. to 5:00 P.M. Monday through Friday from A/E Graphics, Inc.; 4075 North 124th Street, Brookfield, WI 53005; phone (262) 781-7744; fax (262) 781-4250. Call A/E Graphics, Inc. for availability of bid documents. Plans and specifications may also be viewed online at A/E Graphics, Inc. @ www.aegraphics.com. A Prebid Walk Through is scheduled at the site on Tuesday, April 30, 2013 at 9:00 AM. Meet at the front entrance.
The right is reserved to reject any or all bids or to waive informalities.
GREGORY THORNTON, ED.D, Superintendent of Schools.
10294219/4-23-25-5-2