NOTICE
Milwaukee Public Schools will receive sealed quotations for furnishing all labor, tools, equipment and materials necessary, including public liability and property damage insurance to perform all work necessary and incidental to the Window Treatments at the following sites:
Division 1 – Happy Hill School, 7171 W. Brown Deer Road, Milwaukee, WI 53223
Division 2 – Green Bay Avenue School, 3872 N. 8th Street, Milwaukee, WI 53206
Division 3 – 65th Street School, 6600 W. Melvina Street, Milwaukee, WI 53216
Division 4 – Webster Middle School, 6850 N. 53rd Street; Milwaukee, WI 53223
until 1:30 P.M. on Thursday, November 20, 2014 at the Division of Facilities and Maintenance Services; 1124 North 11th Street; Milwaukee, Wisconsin 53233; to the attention of: John Linn, Manager of Design and Construction. The HUB, COIN and Student Participation requirements for the projects are 0%. Plans and specifications may be obtained 7:30 A.M. to 5:00 P.M. Monday through Friday from A/E Graphics, Inc.; 4075 North 124th Street, Brookfield, WI 53005; phone (262) 781-7744; fax (262) 781-4250. Call A/E Graphics, Inc. for availability of bid documents. Plans and specifications may also be viewed online at A/E Graphics, Inc. @ www.aegraphics.com.
A Pre-bid Walk Through is scheduled stating at the Division 4 – Webster Middle School site on Monday, November 10, 2014 at 9:00 AM and continuing on to the other sites. Meet at the front entrance.
The right is reserved to reject any or all bids or to waive informalities.
DARIENNE B. DRIVER, Ed.D, Superintendent.
10630804/10-30-11-6-13